X/5 Meter Wiring: Current Transformer Metering, Diagram and Multiplier

6S Teknoloji · 08.11.2026 · 6 min read

X/5 Meter Wiring: Current Transformer Metering, Diagram and Multiplier — 6S Teknoloji

An X/5 meter is an electricity meter that measures current through a current transformer rather than directly. "X" is the primary current and "5" the standard 5 A that flows from the transformer secondary to the meter: 100/5, 200/5, 400/5 and so on. Almost every facility whose load current exceeds 100 A meters this way. This article explains how X/5 meter wiring is done, which terminals a three-phase meter wiring diagram includes, how the multiplier is calculated and which mistakes are most common in the field.

Why use a current transformer?

The current inputs of meters and analysers are generally designed for 5 A (1 A on some models). Passing the 630 A of a main switchboard directly through a meter is not possible. A current transformer (CT) scales the primary current down at a fixed ratio: in a 400/5 A CT, 400 A on the primary produces 5 A on the secondary. The meter measures 5 A and the ratio is applied to obtain the real value. Direct-connected meters are typically used for loads between 5 and 100 A.

Three-phase X/5 meter wiring: terminals

ConnectionTerminalDescription
Voltage inputsL1, L2, L3, NPhase-to-neutral voltages, directly or via fuses
Current input L1S1 → in, S2 → outSecondary of the CT on phase L1
Current input L2S1 → in, S2 → outSecondary of the CT on phase L2
Current input L3S1 → in, S2 → outSecondary of the CT on phase L3
EarthingS2 common pointSecondary circuit earthed at one point
CommunicationA/B (RS-485)Remote reading over Modbus RTU

The CT's P1 terminal must face the supply side and P2 the load side. Which meter input the S1 and S2 secondary leads reach determines the direction of measurement. Phase order is equally critical: the L1 voltage and the L1 current transformer must be on the same phase; otherwise the meter sees a wrong power factor and under-counts or even negatively counts energy.

Calculating the multiplier

  • Multiplier = primary current ÷ secondary current. 200/5 → 40; 400/5 → 80; 1000/5 → 200.
  • With a voltage transformer as well (MV metering): total multiplier = CT ratio × VT ratio.
  • If the ratio is programmed into the meter, the display shows real kWh; if not, the displayed value is multiplied by the ratio.
  • Example: monthly difference on the display 1,250 kWh, CT 200/5 → real consumption 1,250 × 40 = 50,000 kWh.

Common field mistakes

  • Reversed CT: if P1-P2 or S1-S2 are swapped, that phase's power reads negative; total kW looks low and kWh is under-counted. In a site with no export, negative kW is a sure sign of a wiring error.
  • Phase mix-up: wiring the L3 current to the L2 voltage produces meaningless power factors (e.g. 0.5 capacitive).
  • Open secondary: leaving a CT secondary open under load creates dangerous voltages at the terminals; the shorting link must be closed before the meter is removed.
  • Wrong ratio: a 300/5 CT programmed as 400/5 makes every value 33% too high.
  • Inadequate class: use at least class 0.5 CTs for metering; protection CTs (5P10 etc.) are inaccurate at low load.

How to verify the wiring

At commissioning, read current, voltage, active power and power factor for each phase separately. In a healthy connection all three phases show positive active power and a power factor consistent with the load (e.g. 0.8–0.95 inductive for motor loads). If one phase has negative power or a power factor very different from the others, check that phase's CT direction or phase pairing. A power analyser's phasor diagram screen completes this check in minutes; see what is a power analyser.

Catching wiring errors with remote monitoring

Wiring errors are usually discovered not at commissioning but months later, when the bill and the meter disagree. While reading meters and analysers over Modbus, the 6S Teknoloji platform watches active power per phase; when negative power or an inconsistent power factor appears, it raises a wiring-error alarm and opens a field correction request instead of hiding the value. The multiplier is defined once in the device template, so a CT replaced in the panel is updated in software too. See the electricity monitoring page and the Schneider PM5350 template among supported devices.

Related Content

What Is an Energy Analyzer? Buyer's GuideSchneider PM5350 Modbus TCP IntegrationElectricity Consumption Monitoringcentralised energy monitoringreactive penalty trackingtransformer monitoring softwareWhat Is a Transformer Monitoring System?Current Transformer Ratio and Polarity Errors

FAQ

What does X/5 meter mean?
A meter that measures current through a current transformer. X is the primary current (100, 200, 400 A…) and 5 the standard 5 A fed from the secondary to the meter. Real consumption is the displayed value multiplied by the CT ratio (X ÷ 5).
What happens if a current transformer is wired backwards?
That phase's active power reads negative and total kW and kWh are under-counted. In a site with no export, negative power is a sure sign of a wiring error; it is fixed by correcting S1-S2 or P1-P2, never by taking the absolute value.
How is the multiplier of an X/5 meter calculated?
Multiplier = primary ÷ secondary current: 40 for 200/5, 80 for 400/5. With a voltage transformer, multiply the CT ratio by the VT ratio. If the ratio is programmed into the meter, the display already shows real kWh.