6S Teknoloji · 08.11.2026 · 6 min read
An electricity bill is a handful of multiplications and additions from meter index to amount due; yet without knowing the line items the bill becomes unreadable. This article explains how an electricity bill is calculated, how the T1, T2, T3 meter registers turn into money, and which consumption profile benefits from a time-of-use tariff. Unit prices in the example are illustrative only; always take the current tariff from your distribution company's published table.
In the Turkish time-of-use tariff the day is split into three bands: T1 day 06:00–17:00, T2 peak 17:00–22:00, T3 night 22:00–06:00. The meter keeps a separate register for each band (1.8.1, 1.8.2, 1.8.3). Peak is the most expensive, night the cheapest. See our time-of-use tariff article for selection rules.
Assume a workshop with the following monthly band consumption and hypothetical unit prices (prices are illustrative):
| Band | Consumption (kWh) | Unit price (₺/kWh, example) | Energy charge (₺) |
|---|---|---|---|
| T1 day | 6,000 | 3.00 | 18,000 |
| T2 peak | 2,500 | 4.80 | 12,000 |
| T3 night | 1,500 | 1.80 | 2,700 |
| Total | 10,000 | — | 32,700 |
The same 10,000 kWh on a single-rate tariff at, say, 3.30 ₺ would give an energy charge of 33,000 ₺. In this example time-of-use is 300 ₺ cheaper; a larger peak share would reverse the result.
The decision rule is the share of the peak band in total consumption. Facilities running at night and weekends, cold stores and continuous production lines have a high T3 share and benefit from time-of-use. Shopping centres and restaurants whose activity concentrates after 17:00 have a large T2 share and may be safer on single-rate. At least three months of hourly consumption data are needed to decide.
The 6S Teknoloji platform multiplies the T1-T2-T3 index differences read from the meter by the tariff table and produces an estimated bill before the month closes; when the actual bill is entered it reconciles line by line. Because the reactive ratio and demand are watched on the same screen, penalty items stop being a surprise. In buildings with sub-tenants a separate bill is produced per meter. See the billing solution page for details.
Related Content