Power Exceedance Charge Calculator (kW / kVA)
Enter your contracted capacity and the maximum demand measured by the meter; instantly see this period's capacity charge, the exceedance over the contract and the exceedance charge. Converts kVA contracts to kW using cosφ.
What Are the Capacity Charge and the Exceedance Charge?
Industrial and commercial invoices carry two capacity items independent of the energy consumed (kWh). The capacity charge pays for the grid capacity reserved for your contracted power; it is billed every month as contracted kW × unit price whether you use it or not. The exceedance charge applies when the maximum demand measured in the period (highest 15-minute average power) exceeds the contracted capacity, and is charged on the excess kW.
Unit prices for both items are published in EPDK tariff tables separately by tariff group and period; that is why the tool does not assume a fixed price and asks you to enter the value from your invoice. The result then matches your own tariff exactly.
kVA – kW Conversion: When the Contract Is in kVA
Some contracts state the capacity in kVA, like transformer ratings, while the exceedance comparison is made in kW. Conversion: kW = kVA × cosφ. The lower the power factor, the less kW you get from the same kVA:
| Contracted capacity | cosφ | Equivalent kW |
|---|---|---|
| 500 kVA | 0,80 | 400 kW |
| 500 kVA | 0,90 | 450 kW |
| 500 kVA | 0,95 | 475 kW |
| 500 kVA | 1,00 | 500 kW |
With well-functioning compensation, cosφ of 0.95 or above is achievable; a low cosφ causes both reactive penalties and less active power from the same transformer capacity.
Example Exceedance Calculation (Step by Step)
Suppose a facility with a 400 kW contract measures 460 kW maximum demand in a 30-day period. As example unit prices take a capacity charge of 40 ₺/kW·month and an exceedance charge of 60 ₺/kW·month (take the real values from your invoice):
- Day ratio: 30 ÷ 30 = 1.00.
- Capacity charge: 400 kW × 40 ₺ × 1.00 = 16,000 ₺.
- Exceedance: 460 − 400 = 60 kW. Exceedance charge: 60 kW × 60 ₺ × 1.00 = 3,600 ₺.
- Total capacity items: 19,600 ₺ (excl. VAT and funds). If the exceedance repeats every month, the yearly extra cost is about 43,200 ₺; keeping the peak below 400 kW eliminates this item.
Where Is Maximum Demand on the Invoice and the Meter?
On the invoice, “Capacity Charge” and “Capacity Exceedance Charge” are separate lines; the measured maximum power appears in the index section as “demand” or “maximum demand”. Electronic meters continuously average power over 15-minute windows and store the highest value of the period; a single 15-minute peak determines the exceedance charge for the whole period.
How to Prevent Capacity Exceedance
- Stagger large loads that start simultaneously at peak hours (chillers, compressors, furnaces); this lowers the 15-minute average peak.
- Monitor demand in real time; get an alarm when approaching 90% of the contracted capacity and automatically defer sheddable loads.
- If demand stays far below the contract, lower the contracted capacity to cut the unnecessary capacity charge; if you exceed it constantly, a contract revision may be cheaper than the exceedance charge.
- Keep cosφ above 0.95; you get more kW from the same transformer capacity and avoid reactive penalties.
See the Peak Before You Exceed It
6S Teknoloji monitors 15-minute demand live, warns as you approach the contracted capacity and manages sheddable loads; you prevent the exceedance charge before the invoice arrives.
Demand Management Solution →Frequently Asked Questions
How is the exceedance charge calculated?
The positive difference between the maximum demand measured in the period (kW) and the contracted capacity (kW) is the exceedance kW. It is calculated as exceedance kW × exceedance charge unit price (₺/kW·month) × (days in period ÷ 30). If demand is below the contract, the exceedance charge is zero.
What is contracted capacity?
The maximum power your facility may draw from the grid, agreed with the distribution company in the supply contract. The capacity charge is billed on this value every month, so it should match real needs.
How do I convert kVA to kW?
kW = kVA × cosφ. For example, a 500 kVA contract equals 450 kW at cosφ 0.90. The lower the power factor, the less kW you obtain from the same kVA.
How is maximum demand measured?
The electronic meter averages power over 15-minute windows and records the highest average of the period as maximum demand. A few seconds of inrush current alone does not create demand; a high load lasting 15 minutes does.
Are there risks beyond the charge when exceeding the contract?
Yes. Continuous exceedance can mean overloading transformers and cables, protection trips and a forced contract increase by the distribution company. The exceedance charge is a warning sign; the root cause is peak load management.
Does lowering the contracted capacity make sense?
If your maximum demand has stayed clearly below the contract for months, you are paying the capacity charge for unused capacity. But lowering the contract below your need creates an exceedance charge every month; decide based on 12 months of demand history.
Why do the days in the period change the result?
Capacity charges are published as monthly (30-day) unit prices. If the billing period is 28 or 31 days, the charge is scaled by days in period ÷ 30; the tool applies this ratio automatically.
Where do I find the unit prices?
The most accurate source is your own invoice: the “Capacity Charge” and “Capacity Exceedance Charge” lines show the ₺/kW unit price. EPDK's periodic tariff tables list the same values by your tariff group (industrial, commercial; LV/MV).
In short: how is the exceedance charge calculated?
Convert the contracted capacity to kW (multiply by cosφ if in kVA). Subtract the contracted capacity from the measured maximum demand; if positive, that is the exceedance kW. Multiply the exceedance kW by the exceedance charge unit price on your invoice and by days in period ÷ 30. The capacity charge is contracted kW × capacity charge unit price × the same day ratio.
For the concepts, read what kVA is and how to convert it to kW; for the reactive side use the reactive penalty calculator; to watch transformer loading live see the transformer monitoring solution.
This tool provides an informational estimate. Capacity and exceedance charge unit prices vary by EPDK tariff period and tariff group; the exact amount is determined by the values on the distribution company's invoice. VAT, funds and other taxes are not included.